Toyota Yaris: Radiator support (ASSY)
REPLACEMENT

REMOVAL

INSTALLATION
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimension diagram) Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
After welding, apply polyurethane foam to the corresponding parts.
After welding, apply body sealer and undercoating to the corresponding parts.
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.


Front fender mounting bracket (ASSY)
REPLACEMENT
REMOVAL
INSTALLATION
Temporarily install the new parts and measure each part of the new parts in accordance
with the body dimension diagram. (See the body dimension diagram) Inspe ...
See also:
Winter driving tips
Make sure you have a proper freeze protection for engine coolant.
Only use “Toyota Super Long Life Coolant” or similar high quality ethylene glycol
based non-silicate, non-amine, non-nitrite, ...
Hood
To open the hood:
1. Pull the hood lock release lever. The hood will spring up slightly.
CAUTION.
Before driving, be sure that the hood is closed and securely locked. Otherwise,
the hood ma ...
Clock
Adjusts the hours
Adjusts the minutes
■The clock is displayed when
The engine switch is in the “ON” position.
■When disconnecting and reconnecting battery terminals
The clock ...
